Automatic Rate Change Considerations

Always consider the following points before requesting an Automatic Rate Change.

When the option is run, an Automatic Rate Change Report prints showing the old cost, the new cost, and the difference between the costs. Always process the request first without updating buys (Update Buys with Changed Rates unchecked) and review this report for unexpected and unwanted results before changing the rates (Update Buys with Changed Rates checked). After an actual update, review the report to confirm that the correct changes were made.

Make sure that you have reached the volume level of the contract and changed the contract in Contract Definition before requesting the rate change.

What gets changed?

What is not changed?